Master Ops Center · Home

The single document you and Claude work off until everything ships.

All 21 active workstreams, 600+ tasks, canonical architecture documents, dependency map, and 7/14/30-day plan — in one place. Task data lives in Supabase (canonical); SmartSuite Master Playbook mirrors. Your progress persists in this browser.

V2 Canon — 2026-06-13

Architecture canon V2.0: Supabase = master data store; Cloudflare Workers = compute + bridge; Make.com = selective (per-scenario cost analysis gates retirement); SmartSuite = operational-workflow mirror until $5M ARR triggers franchise port. Source-of-truth: BA-Architecture-Canon-2026-06-12-V2. Doc index: Canonical Document Index V2.1. Strategic decisions: Strategic Decisions Locked 2026-06-13.

Sprint Guardrail · Do Not Overbuild · 2026-06-13

The next 90 days are not about building the whole company. They are about making BA real, credible, useful, and partnership-ready. Pilot = 100-300 athletes (not 500-1,000). Advisors = 3-5 (not a giant board). No ACL prediction claims. Use documents to drive calls. Full framework: One-Page Overview · Partnerships Roadmap V1.1.

Where you stand

Today's focus — top 5 next tasks

TRK · IP + Moat roadmap LIVE Open full TRK view ↗

90 tasks across 11 tracks · Q3 2026 → Q4 2027 · self-referencing meta-workstream. Live from Supabase.

Loading TRK state from Supabase…

External clocks — time anchors

Dates set by the outside world, not by us. Every workstream's target date orbits one of these.

Timeline — Gantt strip

Workstream bars span start_date to target_date. Today marker in orange, external-clock anchors in red. Desktop-only; on phone use the time-bucketed list below.

Near term — next 12 months (monthly)

Long horizon — full roadmap (quarterly)

36 workstreams · grouped by target date

Click any row for the workstream detail view. Bucketed by days-until-target so this-week and overdue rise to the top.

Autonomous Tasks For Review

Master Pending Review Index: a single doc with every deliverable from the autonomous night-run (40+ new docs) with approval status — open the index. Updated each night-run. CANON status tracked. Attorney + clinical sign-offs cataloged.

Loading flagged tasks…

Loading…

Critical path — dependency map

View 1 — Workstream connections

All 36 workstreams. Arrows show where a milestone in one workstream gates work in another. Edge label = number of underlying task-level dependencies.

100% Scroll horizontally / vertically inside the box to pan
Loading workstream connections…

View 2 — Cross-workstream task boundaries

For each workstream, the tasks that connect to OTHER workstreams. Pick a theme below to focus on one set of relationships at a time, or stay on "All" for the full picture.

100% Scroll inside the box to pan
Loading cross-workstream task boundaries…
Connection details — full task descriptions

Quick navigation

TRK · LIVE DASHBOARD ↗
IP + Moat Roadmap · meta-tracker
90 tasks across 11 tracks · Q3 2026 → Q4 2027. Live binding-gate countdowns, track health, P0 watch, milestone-by-quarter, snapshot history. Self-referencing TRK workstream — open Mondays for weekly review, first of month for OKR rollup.
Charter · foundational
Holdco Architecture Charter v1.0
The multi-tenant framing that anchors every build. 15 modules, 7 principles, build audit, gap inventory, cost model, investor view. Read first. Locked 2026-06-04.
Positioning canon · NEW 2026-06-13 evening
BA / Seen.Strong One-Page Overview V1.0
The foundational read for advisors, partners, sponsors, ambassadors. Single page. Locks the recommended positioning + Strongest 90-Day Statement. Read FIRST. #1 priority per 30/60/90 framework.
Partnerships canon · NEW 2026-06-13
Partnerships Integration Roadmap V1.1
3-6-9-12+ month phasing. 64-partner universe. Compound-effect map. 3-door framework. Workstream X. Ambassador pathway. CRM ingest. V1.1 pilot rescoped to 100-300 athletes per Do Not Overbuild.
Workstream detail
A through L · deep dives
Per-workstream breakdown: hours, dependencies, linked docs, full task list.
Canonical docs
Architecture documents
Version-controlled single sources of truth. Click any to open the file.
Meta-Architecture
Classification taxonomy
5-dimension classification of every canon doc. IP layer × system × role × audience × lifecycle.
Update Methodology
8-step change protocol
Cascade matrix · version control · sync checklist · rollback · communication plan.
Nightly Runs
3 scheduled tasks · 1 AM · 3 AM · 5:30 AM
Exercise sync · system health · morning briefing. Email + SmartSuite + local markdown each morning.
Reset
Clear all progress
Removes checkboxes and notes from this browser. Cannot be undone.

Revision history